Protected terminal post 4р 100A, 5х6mm 2х7,5mm

Code: BD10074
Protected terminal post 4р 100A, 5х6mm 2х7,5mm
  • To ask a question
Width, mm 72
Height, mm 98
Depth, mm 45
Number of poles 4
Number of clamp positions per pole 7
Max. rated current, A 100
Number of modular spacings 4
Product type Distribution terminal blocks
Accessories
Drawings
Seria Name Eplan
Terminal blocks - "Quadro"
Completed projects
Omsky Oil Refinery
City: Omsk Year: 2019 - 2020
One of Russia’s most modern refineries — and the country’s leader by refining volumes, Gazprom Neft’s Omsk Refinery is one of the largest and most important oil refineries in the world
Nizhnekamskneftekhim
City: Nizhnekamsk Year: 2020 - 2021
Designed to reduce Tatarstan’s export of petrochemical and gas feedstocks as well as increase its production of target high-value products such as rubber and plastics, the new olefins complex—known as EP-600—will include six cracking furnaces, based on technology licensed by Linde Group, designed to crack 1.8 million tpy of naphtha into 600,000 tpy of ethylene and 272,800 tpy of propylene.
The Amur Gas Processing Plant (GPP) near the town of Svobodny, Amur Region, is one of the largest gas processing enterprises in the world