CPO 90 horizontal angle 500x100, 2 mm included with fasteners (joint plates GTO, screws, nuts)

Code: SDH1050K
Code: SDH1050K
  • To ask a question
Model Included connector
Material thickness, mm 2
Deflection (angle) 90°
Material quality Steel
Material Steel
Cable tray width, mm 500
Cable tray height, mm 100
Surface protection Sendzimir galvanized
Suitable for circuit integrity Yes
Change of direction Horizontal
With cover No
Bend model Smooth bend
Product type System accessories
Type of accessories 90º Horizontal bend
Height 100 mm
Thickness 2.0 mm
Material Pre-galvanized
Width 500 mm