Cover Horizontal Elbow 45°b. 200 included with fasteners, 1,2 mm, hot-dip galvanized steel

Code: SKCN200KHDZ
Code: SKCN200KHDZ
  • To ask a question
Colour Light grey
Width, mm 200
Deflection (angle) 45°
Hinging Yes
Material Steel
Change of direction Horizontal
Suitable for circuit integrity Yes
Material quality Steel
Type of fastening Screw-on
Product type Cover for system accessories
Type of accessories Cover for 45º Horizontal bend
Thickness 1.2 mm
Material Hot-dip galvanized
Width 200 mm
Russian Classification of Products by Economic Activities (OKPD 2) 25.11.23.119
Commodity Nomenclature of Foreign Economic Activity 7326909807