No name

Code: R5IT4766PF
No name
  • To ask a question
Material Steel
Type of surface With powder coating
Colour Grey
Model With permanent frame
Height, mm 2200
Width, mm 600
Depth, mm 600
Demountable Yes
Degree of protection (IP) IP20
Number of doors 2
Number of height units 47
Mounting level Front and rear
Type of profile rail Crank
With roof plate Yes
With earthing Yes
With front door Yes
With backside door Yes
With sidewall Yes
Modular spacing 19 inch
Type of ventilation Active
Front door sort Single leaf perforated
Rear door sort Single leaf perforated
Product type Switching cabinet
Cabinet Width 600 mm
Depth 600 mm
Height 47U
Color RAL7011/7035 (gray/light gray)
Cabinet type Floor
Accessories
The accompanying goods
Completed projects
The Amur Gas Processing Plant (GPP) near the town of Svobodny, Amur Region, is one of the largest gas processing enterprises in the world
Stadium
City: Kaliningrad Year: 2018
The stadium on the Oktyabrskiy Island in Kaliningrad was built specifically for the FIFA World Cup and is able to place up to 35,000 spectators at the same time.
Stadium
City: Rostov-on-Donu Year: 2018
The new stadium Rostov-Arena in Rostov-on-Don is one of the twelve arenas that were built or reconstructed for the FIFA World Cup 2018. It stands out from the other stadiums for its original architectural solution - the northern tribune is open and it overlooks the Don River. Also, a distinctive feature of Rostov-Arena is modern media facade, made along the whole perimeter of the structure.